
Available Documents
Technical and Project Reports
Final Draft Bay Area Regional Desalination Project Greenhouse Gas Analysis - Jan 2013
Memorandum of Agreement to Conduct Site-specific Analysis - Oct 2011
Institutional Analysis Technical Memorandum #2 - Analysis of Feasible Scenarios - Sept. 2011
Pilot Testing at Mallard Slough Engineering Report - June 2010
Appendix A - Pre-Pilot Technical Memoranda
Appendix B - Experimental Plan
Appendix C - Pilot Analytical and Operational Data
Appendix D - Public Outreach Information
Appendix D Video - QuickTime (280MB)
Appendix E - Finished Water Compatibility Analysis
Appendix F - Entrainment and Source Water Study
Appendix G - Concentrate Toxicity Testing
Appendix H - Full-Scale Design Criteria
Appendix I - Full-Scale Cost Estimates
Appendix J - CCWD Water Rights Documentation
Desalination Project Feasibility Study July 2007
Volume I (6.9 MB, PDF)
Volume I Appendices (12.2 MB, PDF)
Volume II (1.9 MB, PDF)
Pilot Water Intake System Consideration Memo
Pilot Water Intake System Diagram and Map
Public Presentations and Meeting Notices and Materials
Sierra Club Bay Chapter March 31, 2012 Workshop Documents:
Contra Costa Council Environmental/Manufacturing Task Force - Desalination in the San Francisco Bay Area - Jan 6, 2012
Bay Area Regional Desalination Project Fact Sheet - Jan. 2010
December 2009 Public Meeting at East Bay Municipal Utilities District Summary
Bay Area Regional Desalination Project Pilot Test Fact Sheet - June 2009
Fall 2006 Public Meetings Summary
Appendix I - Open House Exhibit Boards
Appendix II - Open House Notification Materials
Appendix III - Open House Photos
Presentations on SFPUC's local water resources plan, Sept. - Nov. 2006
Bay Area Regional Desalination Project Fact Sheet - Fall 2006